Free contractor tool
Bathroom Remodel Checklist for Contractors
Use this checklist before quoting a bathroom remodel so photos, measurements, plumbing, electrical, and permit-prep notes are captured.
Copy/paste starter structure
Room dimensions and ceiling height: - Fixture locations and drain/vent constraints: - Electrical, GFCI, lighting, and exhaust: - Waterproofing and tile scope: - Access, staging, and protection: - Permit or inspection triggers: -
What to include
- Room dimensions and ceiling height
- Fixture locations and drain/vent constraints
- Electrical, GFCI, lighting, and exhaust
- Waterproofing and tile scope
- Access, staging, and protection
- Permit or inspection triggers
Example output
- Measure tub alcove, vanity wall, door swing, and window location.
- Photo existing plumbing wall, panel access, exhaust path, and flooring transitions.
- Flag client selections: vanity width, tile, trim kit, mirror, lighting.
BuildPlanGO outputs are planning and estimating aids, not stamped construction documents. Verify measurements, code requirements, and permit submissions with qualified professionals where required.